|
Fixturing up the frame rails so they are square & parallel.
Date: 01/25/2004
Views: 564
|
From the other end.
Date: 01/25/2004
Views: 543
|
My son Jayson doing some grinding on the frame welds.
Date: 01/25/2004
Views: 518
|
|
His friend Miles helping out.
Date: 01/25/2004
Views: 527
|
And another friend, Ryan, pitching in.
Date: 01/25/2004
Views: 513
|
Frame done with a coat of Rustoleum. I put a 13" "Z" in it. Now I need some 4-link brackets & tabs to mount t
Date: 01/25/2004
Views: 538
|
|
Frame with 4-links on brackets. Top links are about 12" long, botom ones are about 19" long.
Date: 02/01/2004
Views: 553
|
4-link attached to rear-end.
Date: 02/01/2004
Views: 561
|
20 minutes later, panhard bar mounted. I put in a series of holes on the brackets on the rear-end to be able to adjust how much
Date: 02/01/2004
Views: 544
|